Traffic to Hinjewadi is slow due to work at Chandni Chowk
Work is underway on a multi-storey bridge at Chandni Chowk. As a result, traffic on the Hinjewadi, Mumbai side is running at a slower pace. Every day there are traffic jams during rush hour. Queues of vehicles had formed on the highway on Sunday afternoon. The road leading to Hinjewadi, Mumbai is expected to be more congested on Monday morning.
The flyover descends on the highway leading to Satara from Mulshi side. His work is underway. The work of erecting the pillar of the bridge is underway. Sheds are placed next to the pillars. Also, there are sheds on the left side. As a result, there were two lanes instead of three lanes, causing traffic congestion.
Tags:
99 Views